Power Generation Technology ›› 2017, Vol. 38 ›› Issue (5): 26-30,38.DOI: 10.3969/J.ISSN.2095-3429.2017.05.006

Previous Articles     Next Articles

Design Optimization of Large-scale Thermal Power Project Construction

HUANG Yuzhong   

  1. Huadian Jiangsu Energy Co., Ltd, Jurong Power Plant, Jurong 212400, China
  • Received:2017-07-21 Published:2017-10-30 Online:2017-10-30

Abstract: Large-scale thermal power project construc-tion needs to go through several procedures, such as the feasibility study, preliminary design, construction design, con-struction commissioning and operation optimization.This pa-per mainly focuses on the following aspects:electronic de-sign optimization steps, design optimization measures, hot spot and difficulties of optimization.Compare the reliability, flexibility, advancement, practicality, economic condition un-der the constraints of regulations.Thus, the cost of the proj-ect will be deduced and the company will get the maxi-mum profit by design optimization.

Key words: large-scale thermal power project construc? tion, design optimization, electrical

CLC Number: