Power Generation Technology ›› 2017, Vol. 38 ›› Issue (1): 51-53.DOI: 10.3969/J.ISSN.2095-3429.2017.01.012

Previous Articles     Next Articles

Problems Analysis Based on the Secondary Circuit Voltage Test of the Main Transformer Voltage Transformer Commissioning Problem

LI Zhen-qing1, SHEN Liang2, MA Dang-guo1   

  1. 1. Huadian Electric Power Research Institute, Hangzhou 310030, China;
    2. Benxi Municipal Development and Reform Commission 117000, China
  • Received:2017-02-08 Revised:2017-03-09 Published:2017-02-28 Online:2017-02-28

Abstract: In the process of commissioning a 2*600MW Coal-fired power plant, The secondary circuit voltage test of # 1 main transformer voltage transformer was carried out. During the test it was found that the vacuum switch MCB 9 of the third winding was not closed,but A voltage is generated at the non-charged side of the switch. After a number of experimental analysis,the problem was found and solved. The secondary circuit voltage test of # 1 main transformer voltage transformer is carried out again. The test results are correct,ensuring the commissioning process

Key words: electrical commissioning, voltage transforme, secondary circuit