Power Generation Technology ›› 2021, Vol. 42 ›› Issue (1): 122-130.DOI: 10.12096/j.2096-4528.pgt.20046

• Power System Planning • Previous Articles     Next Articles

Research on Day Ahead Dynamic Reactive Power Optimization Based on Generator Operation

Bin LU1(), Shan GAO2,*(), Desheng LI1()   

  1. 1 Wanbang Digital Energy Co., Ltd., Changzhou 213164, Jiangsu Province, China
    2 School of Electrical Engineering, Southeast University, Nanjing 210096, Jiangsu Province, China
  • Received:2020-06-24 Published:2021-02-28 Online:2021-03-12
  • Contact: Shan GAO

Abstract:

In order to solve the practical problem of 24-hours dynamic reactive power optimization in power system dispatching, this paper divided generator's operation into three regions in PQ mathematical model, according to the limit output range of generator's operation. Moreover, the action times of discrete control equipment were taken as global inequality constraints, and a complete 24-hours non-linear mixed integer dynamic reactive power optimization mathematical model was established. The simulation results show that the mathematical model in this paper can adjust the output of generators according to the actual situation effectively when the generators are in phase-leading operation. In addition, increasing the number of control equipment's action can reduce the loss of active power in the whole network, but at the same time, the frequent operation will greatly increase the probability of failure of equipment. It is necessary for us to find the appropriate constraints of the action number within the range of reliable acceptance of network losses, so as to save the comprehensive cost of the actual power grid operation.

Key words: dynamic reactive power optimization, generator safe operating limit, interior point method, power system dispatching