指标 | 隶属度 | 指标 | 隶属度 | |
A11 | (1, 0.2, 0, 0, 0) | B56 | (1, 0.7, 0.5, 0, 0) | |
A12 | (1, 0.2, 0, 0, 0) | C11 | (1, 0.6, 0.4, 0.1, 0) | |
A13 | (0.3, 1, 0.3, 0, 0) | C12 | (1, 0.7, 0.4, 0, 0) | |
A2 | (1, 0.7, 0.4, 0, 0) | C21 | (1, 0.2, 0.2, 0, 0) | |
A31 | (0.1, 0.8, 0.1, 0, 0) | C22 | (0.4, 0.7, 0.3, 0, 0) | |
A32 | (0, 0, 0.4, 1, 0.4) | C23 | (0.3, 0.7, 0.3, 0, 0) | |
A33 | (0.1, 0.7, 0.2, 0, 0) | C24 | (0.1, 0.9, 0.1, 0, 0) | |
A34 | (0.3, 1, 0.3, 0, 0) | C25 | (0.3, 1, 0.3, 0, 0) | |
A35 | (1, 0.2, 0.2, 0, 0) | C31 | (0.1, 0.6, 0.4, 0.1, 0) | |
A36 | (0.1, 0.9, 0.1, 0, 0) | C32 | (0.5, 0.7, 0.5, 0.1, 0) | |
A41 | (0, 0.3, 0.7, 0.3, 0) | C41 | (1, 0.6, 0.4, 0.1, 0) | |
A42 | (0.2, 0.5, 0.2, 0.1, 0) | C42 | (0.5, 0.7, 0.5, 0.1, 0) | |
B1 | (0.1, 0.6, 0.4, 0.1, 0) | C43 | (0, 1, 0.6, 0.4, 0.1) | |
B2 | (0, 0.9, 0.7, 0.4, 0.1) | C44 | (0.1, 0.8, 0.1, 0, 0) | |
B3 | (0.1, 0.8, 0.1, 0, 0) | C45 | (0.5, 0.6, 0.4, 0, 0) | |
B4 | (0, 0.3, 0.7, 0.3, 0) | C46 | (0.6, 0.3, 0.2, 0.1, 0) | |
B51 | (0.2, 1, 0.2, 0, 0) | C47 | (1, 0.7, 0.4, 0, 0) | |
B52 | (1, 0.2, 0.2, 0, 0) | C5 | (0.7, 0.3, 0.2, 0, 0) | |
B53 | (0.3, 1, 0.3, 0, 0) | D11 | (1, 0.2, 0.2, 0, 0) | |
B54 | (0, 0, 0.4, 1, 0.4) | D12 | (0.1, 0.8, 0.1, 0, 0) | |
B55 | (0.5, 0.7, 0.5, 0.1, 0) | D2 | (0, 0.3, 0.7, 0.3, 0) |
Tab. 1 The fuzzy evaluation results of indices
指标 | 隶属度 | 指标 | 隶属度 | |
A11 | (1, 0.2, 0, 0, 0) | B56 | (1, 0.7, 0.5, 0, 0) | |
A12 | (1, 0.2, 0, 0, 0) | C11 | (1, 0.6, 0.4, 0.1, 0) | |
A13 | (0.3, 1, 0.3, 0, 0) | C12 | (1, 0.7, 0.4, 0, 0) | |
A2 | (1, 0.7, 0.4, 0, 0) | C21 | (1, 0.2, 0.2, 0, 0) | |
A31 | (0.1, 0.8, 0.1, 0, 0) | C22 | (0.4, 0.7, 0.3, 0, 0) | |
A32 | (0, 0, 0.4, 1, 0.4) | C23 | (0.3, 0.7, 0.3, 0, 0) | |
A33 | (0.1, 0.7, 0.2, 0, 0) | C24 | (0.1, 0.9, 0.1, 0, 0) | |
A34 | (0.3, 1, 0.3, 0, 0) | C25 | (0.3, 1, 0.3, 0, 0) | |
A35 | (1, 0.2, 0.2, 0, 0) | C31 | (0.1, 0.6, 0.4, 0.1, 0) | |
A36 | (0.1, 0.9, 0.1, 0, 0) | C32 | (0.5, 0.7, 0.5, 0.1, 0) | |
A41 | (0, 0.3, 0.7, 0.3, 0) | C41 | (1, 0.6, 0.4, 0.1, 0) | |
A42 | (0.2, 0.5, 0.2, 0.1, 0) | C42 | (0.5, 0.7, 0.5, 0.1, 0) | |
B1 | (0.1, 0.6, 0.4, 0.1, 0) | C43 | (0, 1, 0.6, 0.4, 0.1) | |
B2 | (0, 0.9, 0.7, 0.4, 0.1) | C44 | (0.1, 0.8, 0.1, 0, 0) | |
B3 | (0.1, 0.8, 0.1, 0, 0) | C45 | (0.5, 0.6, 0.4, 0, 0) | |
B4 | (0, 0.3, 0.7, 0.3, 0) | C46 | (0.6, 0.3, 0.2, 0.1, 0) | |
B51 | (0.2, 1, 0.2, 0, 0) | C47 | (1, 0.7, 0.4, 0, 0) | |
B52 | (1, 0.2, 0.2, 0, 0) | C5 | (0.7, 0.3, 0.2, 0, 0) | |
B53 | (0.3, 1, 0.3, 0, 0) | D11 | (1, 0.2, 0.2, 0, 0) | |
B54 | (0, 0, 0.4, 1, 0.4) | D12 | (0.1, 0.8, 0.1, 0, 0) | |
B55 | (0.5, 0.7, 0.5, 0.1, 0) | D2 | (0, 0.3, 0.7, 0.3, 0) |
指标 | 下层指标权向量 | 指标 | 下层指标权向量 | |
A1 | (0.4, 0.3, 0.3) | C2 | (0.20, 0.19, 0.245, 0.26, 0.11) | |
A3 | (0.3, 0.2, 0.2, 0.1, 0.1, 0.1) | C3 | (0.5, 0.5) | |
A4 | (0.6, 0.4) | C4 | (0.1, 0.2, 0.2, 0.2, 0.1, 0.1, 0.1) | |
A | (0.26, 0.475, 0.055, 0.21) | C | (0.16, 0.175, 0.255, 0.21, 0.2) | |
B5 | (0.1, 0.15, 0.2, 0.1, 0.1, 0.35) | D1 | (0.667, 0.333) | |
B | (0.09, 0.21, 0.25, 0.26, 0.19) | D | (0.5, 0.5) | |
C1 | (0.5, 0.5) | G | (0.21, 0.26, 0.247, 0.287) |
Tab. 2 The weighted vectors of indices
指标 | 下层指标权向量 | 指标 | 下层指标权向量 | |
A1 | (0.4, 0.3, 0.3) | C2 | (0.20, 0.19, 0.245, 0.26, 0.11) | |
A3 | (0.3, 0.2, 0.2, 0.1, 0.1, 0.1) | C3 | (0.5, 0.5) | |
A4 | (0.6, 0.4) | C4 | (0.1, 0.2, 0.2, 0.2, 0.1, 0.1, 0.1) | |
A | (0.26, 0.475, 0.055, 0.21) | C | (0.16, 0.175, 0.255, 0.21, 0.2) | |
B5 | (0.1, 0.15, 0.2, 0.1, 0.1, 0.35) | D1 | (0.667, 0.333) | |
B | (0.09, 0.21, 0.25, 0.26, 0.19) | D | (0.5, 0.5) | |
C1 | (0.5, 0.5) | G | (0.21, 0.26, 0.247, 0.287) |
评价指标 | 模糊评价矩阵 | 评分 |
实施过程 | (0.42, 0.34, 0.20, 0.04, 0.00) | 82.5 |
经济效益 | (0.04, 0.49, 0.33, 0.13, 0.01) | 68.2 |
配网性能 | (0.30, 0.43, 0.23, 0.04, 0.00) | 79.8 |
社会影响及可持续性 | (0.25, 0.30, 0.33, 0.12, 0.00) | 73.8 |
综合评价 | (0.24, 0.39, 0.28, 0.09, 0.00) | 75.6 |
Tab. 3 Evaluation results under traditional index system of distribution network
评价指标 | 模糊评价矩阵 | 评分 |
实施过程 | (0.42, 0.34, 0.20, 0.04, 0.00) | 82.5 |
经济效益 | (0.04, 0.49, 0.33, 0.13, 0.01) | 68.2 |
配网性能 | (0.30, 0.43, 0.23, 0.04, 0.00) | 79.8 |
社会影响及可持续性 | (0.25, 0.30, 0.33, 0.12, 0.00) | 73.8 |
综合评价 | (0.24, 0.39, 0.28, 0.09, 0.00) | 75.6 |
评价指标 | 模糊评价矩阵 | 评分 |
实施过程 | (0.42, 0.34, 0.20, 0.04, 0.00) | 82.5 |
经济效益 | (0.10, 0.46, 0.30, 0.12, 0.01) | 70.2 |
配网性能 | (0.34, 0.41, 0.22, 0.04, 0.00) | 80.8 |
社会影响及可持续性 | (0.25, 0.30, 0.33, 0.12, 0.00) | 73.8 |
综合评价 | (0.27, 0.38, 0.27, 0.08, 0.00) | 76.4 |
Tab. 4 Evaluation results under the index system ofactive distribution network
评价指标 | 模糊评价矩阵 | 评分 |
实施过程 | (0.42, 0.34, 0.20, 0.04, 0.00) | 82.5 |
经济效益 | (0.10, 0.46, 0.30, 0.12, 0.01) | 70.2 |
配网性能 | (0.34, 0.41, 0.22, 0.04, 0.00) | 80.8 |
社会影响及可持续性 | (0.25, 0.30, 0.33, 0.12, 0.00) | 73.8 |
综合评价 | (0.27, 0.38, 0.27, 0.08, 0.00) | 76.4 |
1 | 张勇军, 刘子文, 邓丰强. 柔性互联配电网研究现状综述及其发展探索[J]. 广东电力, 2020, 33 (12): 3- 13. |
ZHANG Y J , LIU Z W , DENG F Q . Review on research status and development of flexible interconnected distribution networks[J]. Guangdong Electric Power, 2020, 33 (12): 3- 13. | |
2 | 邢晓敏, 何铁新, 吴卓, 等. 配电网运行状态评估递阶模型构建及评价方法研究[J]. 智慧电力, 2019, 47 (4): 81- 86. |
XIANG X M , HE T X , WU Z , et al. Construction of hierarchical model and evaluation method for distribution network operation status evaluation[J]. Smart Power, 2019, 47 (4): 81- 86. | |
3 | 赵骞, 张肖, 汪鸿, 等. 融入区块链理念的配电网数据池构建方法研究[J]. 发电技术, 2019, 40 (6): 540- 547. |
ZHAO Q , ZHANG X , WANG H , et al. Research on construction method of distribution network data pool integrating block chain concept[J]. Power Generation Technology, 2019, 40 (6): 540- 547. | |
4 | 徐璐, 熊天军, 杨素, 等. 计及新电改政策的配电网变化影响因素及其规划方法综述[J]. 智慧电力, 2020, 48 (9): 108- 117. |
XU L , XIONG T J , YANG S , et al. Survey of distribution network change factors & planning methods under new electricity reform policy[J]. Smart Power, 2020, 48 (9): 108- 117. | |
5 | 陈兢, 周哲, 方敏. 基于层次分析法及灰色聚类决策模型的主动配电网经济活动外部性评价[J]. 浙江电力, 2020, 39 (5): 88- 92. |
CHEN J , ZHOU Z , FANG M . Externality evaluation of active distribution network economic activities based on analytic hierarchy process and grey clustering decision model[J]. Zhejiang Electric Power, 2020, 39 (5): 88- 92. | |
6 | 杨磊, 任健. 基于层次分析法的燃煤发电企业低碳综合评价[J]. 发电技术, 2019, 40 (1): 66- 70. |
YANG L , REN J . Low carbon comprehensive evaluation of coal-fired power plants based on analytic hierarchy process[J]. Power Generation Technology, 2019, 40 (1): 66- 70. | |
7 | 李强年, 赵巧妮, 聂龑. 基于层次分析法(AHP)的风电产业发展影响因素探析: 以甘肃省酒泉风力发电基地为例[J]. 电网与清洁能源, 2019, 35 (10): 75- 81. |
LI Q N , ZHAO Q N , NIE Y . Research on the factors affecting the development of wind power industry based on analytic hierarchy process (AHP): taking Jiuquan wind power generation base in Gansu province as an example[J]. Power System and Clean Energy, 2019, 35 (10): 75- 81. | |
8 |
WIND Y , SAATY T L . Marketing applications of the analytic hierarchy process[J]. Management Science, 1980, 26 (7): 641- 658.
DOI |
9 |
SAATY T L . Mathematical modeling of dynamic decisions; priorities and hierarchies with time dependence[J]. Mathematics and Computers in Simulation, 1979, 21 (4): 352- 358.
DOI |
10 | RN X U , ZHAI X Y . Extensions of the analytic hierarchy process in fuzzy environment[J]. Fuzzy Sets & Systems, 1992, 52 (3): 251- 257. |
11 | HECKLER C E . Applied multivariate statistical analysis[J]. Technometrics, 2005, 47 (4): 517. |
12 |
BONNIE J M . Closing the assessment loop using pre- and post-assessment[J]. Reference Services Review, 2011, 39 (2): 244- 259.
DOI |
13 | 黄德春, 许长新. 投资项目后评价的现有理论及评析[J]. 河海大学学报(自然科学版), 2003, 31 (6): 105- 108. |
HUANG D C , XU C X . Comments on theory of post-evaluation of investment projects[J]. Journal of Hohai University (Natural Sciences), 2003, 31 (6): 105- 108. | |
14 | 查健禄, 田钦谟, 李盛德. 综合评价问题的系统分析[J]. 系统工程学报, 2000, 15 (2): 124- 130. |
CHA J L , TIAN Q M , LI S D , et al. Systematic analysis of problem in comprehensive evaluation[J]. Journal of Systems Engineering, 2000, 15 (2): 124- 130. | |
15 | 冯圣洪, 周心权. 一种综合评价指标属性值规一量化技术新途径[J]. 系统工程学报, 2000, 15 (2): 187- 191. |
FENG S H , ZHOU X Q . A new way to normalize attribute-value of integrating assessment-indicators[J]. Journal of Systems Engineering, 2000, 15 (2): 187- 191. | |
16 | 方嵩, 彭嵩, 赵晋泉, 等. DG启动及运行特性综合评价指标与方法[J]. 电测与仪表, 2018, 56 (14): 5- 11. |
FANG S , PENG S , ZHAO J , et al. Comprehensive evaluation index and method for DGs' startup and operation characteristics[J]. Electrical Measurement & Instrumentation, 2018, 56 (14): 5- 11. | |
17 | 冯磊, 李楠, 顾洁, 等. 多元主体下有源配电网规划方案协同评估研究[J]. 供用电, 2019, 36 (8): 7- 15. |
FENG L , LI N , GU J , et al. Research on collaborative evaluation of active distribution network planning based on multi-stakeholder[J]. Distribution & Utilization, 2019, 36 (8): 7- 15. | |
18 | 熊剑峰. 基于AHP法与FCE法的主动配电网现状网架综合评价体系与方法的研究[D]. 南昌: 南昌大学, 2017. |
XIONG J F.Research on comprehensive evaluation system and method of active distribution network frame based on AHP and FCE method[D].Nanchang: Nanchang University, 2017. | |
19 | 陈雪, 黄伟, 叶琳浩, 等. 基于多源数据的配电网规划辅助决策系统研究[J]. 广东电力, 2017, 30 (1): 53- 58. |
CHEN X , HUANG W , YE L H , et al. Study on auxiliary decision system for power distribution network planning based on multisource data[J]. Guangdong Electric Power, 2017, 30 (1): 53- 58. | |
20 | 彭丽霖. 主动配电网下分布式能源系统规划运行及效益评价研究[D]. 保定: 华北电力大学, 2017. |
PENG L L.Research on planning, operation and benefit evaluation of distributed energy system under active distribution network[D].Baoding: North China Electric Power University, 2017. | |
21 | 黄晓娟. 基于多目标层次分析法的输变电项目后评价体系研究[D]. 北京: 华北电力大学, 2014. |
HUANG X J.Research on post-evaluation system of power transmission and transformation project based on multi-objective AHP[D].Beijing: North China Electric Power University, 2014. | |
22 | 杨波. 10 kV及以下配网建设与改造投资后评价指标体系研究[J]. 南方电网技术, 2009, 3 (s1): 8- 14. |
YANG B . Study on post-project evaluation index system for 10 kV and below distribution network investment[J]. Southern Power System Technology, 2009, 3 (s1): 8- 14. | |
23 | 吕雷. 输变电项目后评价因素权重的确定[J]. 煤炭技术, 2010, 29 (8): 35- 37. |
LÜ L . Determining the weight of factors in power transmission project post-project evaluation[J]. Coal Technology, 2010, 29 (8): 35- 37. | |
24 | 何滢. 配电网项目后评价研究及应用[D]. 北京: 华北电力大学, 2012. |
HE Y.Research and application of post evaluation of distribution network project[D].Beijing: North China Electric Power University, 2012. | |
25 | 白恒远, 潘凯岩, 王森, 等. 基于拉格朗日函数的配电网评价指标权重研究[J]. 电测与仪表, 2019, 56 (8): 1- 8. |
BAI H Y , PAN K Y , WANG S , et al. Research of comprehensive quantitative evaluation index system and determination of weights of distribution network operation mode[J]. Electrical Measurement & Instrumentation, 2019, 56 (8): 1- 8. | |
26 | 贺静, 苏卫华. 中压配电网关键评价指标体系研究[J]. 供用电, 2010, 27 (3): 26- 28, 39. |
HE J , SU W H . Study on key evaluation index system about middle-voltage distribution network[J]. Distribution & Utilization, 2010, 27 (3): 26- 28. | |
27 | 谢季坚, 刘承平. 模糊数学方法及其应用[M]. 武汉: 华中理工大学出版社, 2005: 143- 161. |
XIE J J , LIU C P . Fuzzy mathematics method and its application[M]. Wuhan: Huazhong University of Technology Press, 2005: 143- 161. | |
28 | 兰继斌, 徐扬, 霍良安, 等. 模糊层次分析法权重研究[J]. 系统工程理论与实践, 2006, 26 (9): 109- 114. |
LAN J B , XU Y , HUO L A , et al. Research on the priorities of fuzzy analytical hierarchy process[J]. System Engineering Theory and Practice, 2006, 26 (9): 109- 114. |
[1] | Hongbo LIU, Shencheng LIU, Xueyang GAI, Yongfa LIU, Yutong YAN. Overview of Active Distribution Network Planning With High Proportion of New Energy Access [J]. Power Generation Technology, 2024, 45(1): 151-161. |
[2] | Jianhao SUN, Zhuang CHU. Optimal Configuration of Distributed Generation Considering Carbon Trading and Reactive Power Compensation [J]. Power Generation Technology, 2024, 45(1): 142-150. |
[3] | Ning WANG, Zhiqiang CHEN, Mingyi LIU, Peng ZHANG, Xi CAO, Zeyu LU, Haodong LEI, Chuanzhao CAO, Xiao YAN, Guopeng ZHOU. Health Status Assessment of Lithium-ion Battery Based on Fuzzy Comprehensive Evaluation [J]. Power Generation Technology, 2022, 43(5): 784-791. |
[4] | Jianwei LIU, Xuebin LI, Xiaoou LIU. Distributed Power Access and Energy Storage Configuration in Active Distribution Network [J]. Power Generation Technology, 2022, 43(3): 476-484. |
[5] | Si GU, Xiao SUN, Chang MA, Jing CHEN. Improved Power Flow Algorithm for Distributed Ring Network Based on Loop Analysis [J]. Power Generation Technology, 2020, 41(6): 675-680. |
[6] | Wei FANG,Bo ZENG,Fuqiang XU,Jianhua ZHANG. Evaluation on Load Restoration of Distribution System Based on Distributed Generation in Smart Buildings After Extreme Disasters [J]. Power Generation Technology, 2019, 40(5): 440-447. |
[7] | Shuifu GU,Yuan ZHANG,Xiying CHEN. Research on the Planning Method of Active Distribution Network [J]. Power Generation Technology, 2018, 39(3): 220-225. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||