发电技术 ›› 2020, Vol. 41 ›› Issue (3): 328-333.DOI: 10.12096/j.2096-4528.pgt.18132

• 新能源 • 上一篇    

含不同机组风电场低电压穿越能力仿真研究

朱月1(),沙俊民2,赵静1   

  1. 1 国网浙江省电力有限公司湖州供电公司, 浙江省 湖州市 313000
    2 国网浙江省电力有限公司检修分公司, 浙江省 杭州市 310000
  • 收稿日期:2019-07-20 出版日期:2020-06-30 发布日期:2020-06-24
  • 作者简介:朱月(1987),女,助理工程师,从事220 kV变电运维工作, zhuyuekk@163.com|沙俊民(1987),男,助理工程师,从事500 kV变电运维工作|赵静(1987),女,工程师,从事电网调控工作

Simulation Study on Low Voltage Ride-through Capability of Wind Farms With Different Units

Yue ZHU1(),Junmin SHA2,Jing ZHAO1   

  1. 1 State Grid Zhejiang Electric Power Co., Ltd., Huzhou Power Supply Company, Huzhou 313000, Zhejiang Provnince, China
    2 State Grid Zhejiang Electric Power Co., Ltd., Maintenance Branch, Hangzhou 310000, Zhejiang Provnice, China
  • Received:2019-07-20 Published:2020-06-30 Online:2020-06-24

摘要:

在PSCAD/EMTDC仿真环境下建立双馈风力发电场及恒速恒频风力发电场交流并网仿真模型,通过交流系统三相短路故障仿真,研究对比2种不同风力发电机组的低电压穿越能力。仿真得出恒速恒频风力发电机组避免飞车的极限切除时间,故障持续时间小于极限切除时间便可维持恒速恒频风力发电机组的稳定不脱网运行。通过在不同点设置短路故障对比得出,故障点距离风电场电气距离越远,风电场低电压穿越能力越强。

关键词: 风电场, 低电压穿越, 双馈风力发电机, 恒速恒频风力发电机, PSCAD/EMTDC

Abstract:

The simulation platform of wind farms with fixed speed induction wind turbines and doubly-fed induction wind turbines connected to the power grid was built in the electromagnetic transient simulation software PSCAD/EMTDC. Serious three-phase faults in the power grid were carried out to analyze the low voltage ride-through (LVRT) ability of various wind turbines. The research results show that wind farm's LVRT ability with fixed speed induction wind turbines depends on the fault critical clearing time. When the fault clearing time is shorter than the fault critical clearing time, the wind farm with fixed speed induction wind turbines can have LVRT ability. Different points of faults simulations at power grid were carried out at the simulation platform. The research results show that wind farm's LVRT ability depends on the electrical distance of the point of fault. The longer the electrical distance of the point of fault to the wind farm is, the stronger the wind farm's LVRT ability.

Key words: wind farms, low voltage ride-through (LVRT), doubly-fed induction wind turbine, fixed speed induction wind turbine, PSCAD/EMTDC

中图分类号: