Preparation and Analysis of RB Test in a 622MW Thermal Power Plant with a W Flame Boiler

ZHANG Shao-yong, LUO Chang-fu, TIAN Ping, YANG Bo-wen   

  1. Huadian Electric Power Research Institute, Hangzhou 310030, China
  • Received:2017-05-27 Revised:2017-07-31 Published:2017-08-30 Online:2017-08-30

Abstract: This paper introduces a Runback(Referred to as RB)function test carried out on a W Flame boiler unit,which is equipped with the double-inlet and double-outlet coal milling system,heavy fuel oil guns and double cyclone burners. It focuses on the logic function design,preparation test and test attentions.The process of RB function test has been described,analysis of the RB test data shows that there are some problems in the test process,and the corresponding solutions and logic optimization were presented,after then the RB function can be successfully conducted in practice. The realization of RB function would improve the operation security coefficient as well as the economic and social benefits.

Key words: double-inlet and double-outlet, W Flame, runback function test, preparation test, logic optimization, heavy fuel oi