Power Generation Technology ›› 2020, Vol. 41 ›› Issue (4): 354-360.DOI: 10.12096/j.2096-4528.pgt.18070

• Energy Internet • Previous Articles     Next Articles

Optimization of πT Hybrid Structure of 110 kV Power Grid

Zhiyong SHI1(),Guomin WANG1,Qi GENG1,Yuan ZHANG2,*(),Tianhua WANG2   

  1. 1 State Grid Zhengzhou Power Supply Co., Ltd., Zhengzhou 450000, Henan Province, China
    2 Beijing T & D Power Research Co., Ltd., Changping District, Beijing 102206, China
  • Received:2019-02-08 Published:2020-08-31 Online:2020-09-01
  • Contact: Yuan ZHANG

Abstract:

There are some operational problems of the πT hybrid structure, such as large workload of operation and maintenance, poor flexibility and scalability, which can not meet the increasing demand for power supply reliability. In this paper, the optimization scheme of the πT hybrid structure connection structure was put forward, and the technical and economic demonstration of the optimization scheme was carried out. The concrete alteration scheme of πT mode to chain π connection mode was studied, and the networking principle of 110 kV power grid was established, which can direct the implementation and landing of the optimization of the 110 kV power grid with πT hybrid structure.

Key words: network structure, πt hybrid, chain type π connection, single-bus section

CLC Number: