1 | 肖白, 赵殿平, 姜卓. 城市配电网供电能力评估综述[J]. 发电技术, 2018, 39 (3): 213- 219. | 1 | Xiao B , Zhao D P , Jiang Z , et al. Power supply capability evaluation of urban distribution network驶[J] Power Generation Technology, 2018, 39 (3): 213- 219. | 2 | 顾水福, 张媛, 陈西颖. 主动配电网规划方法研究[J]. 发电技术, 2018, 39 (3): 220- 225. | 2 | Gu S F , Zhang Y , Chen X Y . Research on the planning method of active distribution network[J] Power Generation Technology, 2018, 39 (3): 220- 225. | 3 | 黄华生. 3条进线3台变压器的110 kV变电站主接线方式选择[J]. 供用电, 2012, 29 (5): 42- 45. | 3 | Huang H S . Selection of main connection methods for a 110 kV substation with three incoming lines and three transformers[J] Distribution and Utilization, 2012, 29 (5): 42- 45. | 4 | 贺春光, 徐庆华, 巩保峰, 等. 110 kV扩大内桥主接线型式的优化[J]. 电力与能源, 2017, 38 (3): 363- 365. | 4 | He C G , Xu Q H , Gong B F , et al. Optimization of main wiring type of 110 kV extended inner bridge[J] Power & Energy, 2017, 38 (3): 363- 365. | 5 | 束洪春, 孙士云, 刘宗宾, 等. 昆明电网110 kV母线分段运行与并列运行方式比较[J]. 中国电力, 2008, 41 (6): 39- 42. | 5 | Shu H C , Sun S Y , Liu Z B , et al. Comparison and analysis of 110 kV bus segmentation and parallel operation in Kunming power grid[J] Electric Power, 2008, 41 (6): 39- 42. | 6 | 张琪祁, 冯煜尧, 欧阳帆, 等. 考虑N-1-1停运标准的城市电网结构[J]. 华东电力, 2014, 42 (5): 893- 897. | 6 | Zhang Q Q , Feng Y Y , Ouyang F , et al. Urban power grid structure considering the N-1-1 outage standard[J] East China Electric Power, 2014, 42 (5): 893- 897. | 7 | 程一鸣, 赵志辉, 王天华. 城市110 kV高压配电网接线方式研究[J]. 电网技术, 2008, 32 (S2): 113- 115. | 7 | Cheng Y M , Zhao Z H , Wang T H . Research on connection mode of civil 110 kV distribution network[J] Power System Technology, 2008, 32 (S2): 113- 115. | 8 | 范云滩, 刘剑, 李俊娥, 等. 基于符号动力学的配电网结构风险评估[J]. 电网技术, 2013, 37 (5): 1244- 1251. | 8 | Fan Y T , Liu J , Li J E , et al. Symbolic dynamics based risk assessment of distribution network structure[J] Power System Technology, 2013, 37 (5): 1244- 1251. | 9 | 吴霜, 卫志农, 孙国强, 等. 考虑网络抗毁性的配电网网架多目标规划[J]. 电力系统自动化, 2014, 38 (3): 137- 142. | 9 | Wu S , Wei Z N , Sun G Q , et al. Multi-objective planning of distribution network considering network survivability[J] Automation of Electric Power Systems, 2014, 38 (3): 137- 142. | 10 | 范宏, 丁会凯, 周利俊, 等. 城市电网中110 kV电网接线模式的经济性比较[J]. 华东电力, 2013, 41 (4): 689- 693. | 10 | Fan H , Ding H K , Zhou L J , et al. Economic comparison of 110 kV network connection modes in urban grid[J] East China Electric Power, 2013, 41 (4): 689- 693. | 11 | 丁宣文.变电站电气主接线的可靠性与经济性评估[D].成都:西南交通大学, 2011. | 11 | Ding X W.Reliability and economic evaluation of electrical main wiring in substations[J].Chengdu: Southwest Jiaotong University, 2011. | 12 | 粱臣, 公元. 增加合解环功能的备自投在110 kV内桥式主接线变电站中的应用[J]. 电力系统保护与控制, 2009, 37 (12): 118- 121. | 12 | Liang C , Gong Y . Application of back-up switching equipments with the new function of closing or opening loops in 110 kV inner-bridge-connected substations[J] Power System Protection and Control, 2009, 37 (12): 118- 121. | 13 | 李复明, 王晖, 杨柳, 等. 按3台主变压器压器设置的城市110 kV GIS枢纽变电站电气主接线形式研究[J]. 陕西电力, 2008, 36 (11): 112- 116. | 13 | Li F M , Wang H , Yang L , et al. Study of main wiring forms for 110 kV GIS urban load-ter Substation based on three main transformers arrangement[J] Shaanxi Electric Power, 2008, 36 (11): 112- 116. |
|