622MW级“W”火焰锅炉机组RB试验准备及分析
张少勇, 罗昌福, 田平, 杨博闻
Preparation and Analysis of RB Test in a 622MW Thermal Power Plant with a W Flame Boiler
ZHANG Shao-yong, LUO Chang-fu, TIAN Ping, YANG Bo-wen
发电技术 . 2017, (4): 18 -22 .  DOI: 10.3969/J.ISSN.2095-3429.2017.04.004