600MW 级亚临界机组凝汽器双背压节能改造研究
|
任渊源1,黄琪薇1,田家平2,光旭1,冯立国3
|
(1.中国能源建设集团浙江省电力设计院有限公司,浙江 杭州 310012; 2.中国能源建设集团安徽省电力设计院有限公司,安徽 合肥 230601; 3. 浙江国华浙能发电有限公司,浙江 宁海 315612) |
|
ResearchontheDoubleBackPressureRetrofit forCondenserof600MWSubcriticalUnit |
REN Yuanyuan1,HUANG Qiwei1,TIAN Jiaping2,GUANG Xu1,FENG Liguo3
|
(1.ZhejiangElectricPowerDesign InstituteCo.LtdofChinaEnergyEngineeringGroup,Hangzhou310012,ZhejiangProvince, China;2.Anhui Electric Power Design Institute Co.Ltd of China Energy Engineering Group,Hefei 230601,Anhui Province, China;3.ZhejiangGuohuaZhenengPowerGenerationCo.,Ltd,Ninghai315612,ZhejiangProvince,China)
|
|