Your Location:
Home >
Browse articles >
Technical and Economic Analysis of the Alteration From 600MW Supercritical Condensing Power to Co-generation Unit
Vol. 38, Issue 6, Pages: 24-27(2017)
Updated:2025-06-06
|
Technical and Economic Analysis of the Alteration From 600MW Supercritical Condensing Power to Co-generation Unit
DOI:10.3969/J.ISSN.2095-3429.2017.06.006
Scan QR Code
26
Views
1168
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Related Articles
Economic Analysis of Heating Reform of 300 MW Condensing Power Plant
YOLOv5m and Segment Anything Model Collaborative Segmentation Method for Rapid and Accurate Detection of Incoming Coal Particle Size in Thermal Power Plants
Mechanical Stability Analysis of High-Temperature Superconducting D-Shaped Magnets and Toroidal Field Coils for Fusion
A Time-Series and Multi-Factor-Based Prediction Model for Ash Deposition and Slagging on Boiler Heating Surfaces
Coordinated Control Technology for Electricity-Hydrogen Coupling System Clusters
Related Author
Xianwei DU
Wentao ZHANG
Junhui ZHANG
Related Institution
Datang Central-China Electric Power Test Research Institute

