Your Location:
Home >
Browse articles >
Air Conditioning and Ventilation System Design for Joint Factory Building
Vol. 38, Issue 3, Pages: 84-87(2017)
Updated:2026-05-15
  • Export

  • Collection

  • Album

    • Air Conditioning and Ventilation System Design for Joint Factory Building

    • DOI:10.3969/J.ISSN.2095-3429.2017.03.021    

      CLC:

    Scan QR Code

  •  
  •  
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

1

Views

7

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Outline

Related Articles

Effects of Variable-Flow Water Distribution on Cooling Performance of Wet Cooling Towers and Its Optimization
Application on Control Strategy of Variable Fresh Air in South Metro Station
Mechanical Stability Analysis of High-Temperature Superconducting D-Shaped Magnets and Toroidal Field Coils for Fusion
Photovoltaic Power Prediction Based on Sample Entropy Clustering Decomposition-Inverted Transformer Model
A Time-Series and Multi-Factor-Based Prediction Model for Ash Deposition and Slagging on Boiler Heating Surfaces

Related Author

LUO Cheng
WANG Lei
LI Yang
MENG Qingming
ZHANG Guibin
ZHAO Yuanbin
LUO Jia
ZHOU Qun

Related Institution

China Energy Baoqing Coal Power & Chemical Company Limited
China Grid Energy Hami Coal Power Company Limited, Hami 839000, Xinjiang Uygur Autonomous Region
School of Nuclear Science, Energy and Power Engineering, Shandong University
Guangzhou Metro Design and Research Institute Co., Ltd