Your Location:
Home >
Browse articles >
A Forecasting Method for Frequency Regulation Capacity Demand Interval Based on Chance-Constrained Optimization
Power Generation Technology Pages: 1-9(2026)
Updated:2026-09-30
|
A Forecasting Method for Frequency Regulation Capacity Demand Interval Based on Chance-Constrained Optimization
- “In order to achieve the "dual carbon" goal, new energy has gradually become the main source of installed capacity and electricity in the power system. This article introduces its research progress in the field of power frequency regulation. The research team has established a frequency regulation capacity demand interval prediction system based on opportunity constraint optimization, providing a solution to the frequency regulation problem caused by the volatility of new energy.”
DOI:10.12096/j.2096-4528.pgt.25274
Revised:2025-09-21
Scan QR Code
8
Views
4
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Related Articles
Evaluation of Comprehensive Benefits of Electric Energy Substitution in Regional Power Grids Based on Improved Cloud Model
Research on the Development Trends and Countermeasures of Integrated Energy Services
Architecture Design of Virtual Power Plant Based on “Three Flow Separation-Convergence”
Study on Participation of Electricity-driven Thermal Load in Real-time Scheduling of New Power System
Analysis and Prediction of Energy Losses in AC/DC Conversion Processes for China’s New Power Systems
Related Author
ZHENG Yang
REN Yucheng
WANG Yuwei
XU Dingji
YANG Huimin
LAN Guoqin
LU Ye
KAN Yansheng
Related Institution
Zhenjiang Power Supply Branch, State Grid Jiangsu Electric Power Company Limited
State Grid Jiangsu Electric Power Company Limited
School of Electrical Engineering, Southeast University
China Huadian Group Co., Ltd., Xicheng District
Jiangsu Huadian Wangting Natural Gas Power Generation Co., Ltd.

