Your Location:
Home >
Browse articles >
Application of Practical Data Synchronization Technology in Multi Person Cooperation Mechanism of New Distribution System Planning
Power Generation Technology   Vol. 45, Issue 2, Pages: 363-372(2024)
Smart Grid|Updated:2025-06-15
  • Export

  • Collection

  • Album

    • Application of Practical Data Synchronization Technology in Multi Person Cooperation Mechanism of New Distribution System Planning

    • “In the era of energy Internet, experts integrate heterogeneous databases to provide solutions for the planning of new distribution systems, and verify the effectiveness of data synchronization technology.”
    • DOI:10.12096/j.2096-4528.pgt.21138    

      CLC:

    Scan QR Code

  •  
  •  

27

Views

78

Downloads

2

CSCD

Alert me when the article has been cited
Submit
Outline

Related Articles

Multi-Time Scale Optimization Strategy for New Distribution System Oriented to Photovoltaic Consumption and Low Carbon Demand Response of Ice Storage Air Conditioning Groups
Distributed Coordinated Optimization of Interconnected Island Microgrid Clusters Considering Multiple Flexible Resources
Fault Data Identification in Condition Monitoring Systems for Wind Turbine Generator Bearings Based on BERT Model
Coordinated Control Technology for Electricity-Hydrogen Coupling System Clusters
Application Research on Fiber-Optic Sensing Technology in Battery State of Charge and State of Health Monitoring

Related Author

WANG Kui
YU Meng
ZHANG Haijing
LI Yan
LIU Zhe
GUO Junhong

Related Institution

State Grid Electric Power Research Institute
State Grid Electric Power Research Institute Wuhan Energy Efficiency Evaluation
State Grid Shandong Electric Power Company
State Grid Shandong Electric Power Company Marketing Service Center (Metering Center)
School of Environmental Science and Engineering, North China Electric Power University, Changping District