Your Location:
Home >
Browse articles >
Preliminary Analysis of the 2·15 Power Outage in Texas, U.S. and Its Enlightenment to the Construction of China's Electricity Market
Power Generation Technology   Vol. 42, Issue 1, Pages: 131-139(2021)
Power System Planning|Updated:2025-07-04
  • Export

  • Collection

  • Album

    • Preliminary Analysis of the 2·15 Power Outage in Texas, U.S. and Its Enlightenment to the Construction of China's Electricity Market

    • DOI:10.12096/j.2096-4528.pgt.21016    

      CLC:

    Scan QR Code

  •  
  •  
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

78

Views

367

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Outline

Related Articles

Coordinated Trading Mode of Green Electricity and Green Certificates in Regional Common Markets
Research on Capacity Allocation Optimization Model of Thermal Power Unit Participating in Electricity Market Considering Carbon Trading
A Two-Stage Optimization Strategy for Virtual Power Plants Considering the Electricity-Hydrogen Market
Review of Virtual Power Plant Under the Background of “Dual Carbon”
Architecture Design of Virtual Power Plant Based on “Three Flow Separation-Convergence”

Related Author

ZHAO Hailing
YANG Yongli
ZHANG Zhongming
WANG Tianfeng
ZHANG Yichen
LI Xiaozhu
LI Wei
WANG Yingxu

Related Institution

Xinjiang Power Trading Center Co., LTD., Urumqi 830017, Xinjiang Uygur Autonomous Region
School of Electrical Engineering, Xinjiang University, Urumqi 830046, Xinjiang Uygur Autonomous Region
School of Economics and Management, Northeast Electric Power University
School of Economics and Management, North China Electric Power University, Changping District
Huadian Electric Power Research Institute Co., Ltd.