Your Location:
Home >
Browse articles >
Analysis and Application of Fast Closing Boundary Conditions for Governing Valves of 1 000 MW Ultra-supercritical Unit
Power Generation Technology Vol. 41, Issue 6, Pages: 689-696(2020)
Power Generation and Enviromental Protection|Updated:2025-07-04
|
Analysis and Application of Fast Closing Boundary Conditions for Governing Valves of 1 000 MW Ultra-supercritical Unit
DOI:10.12096/j.2096-4528.pgt.20004
Scan QR Code
45
Views
421
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Related Articles
Research on Performance Optimization of Transient Load Change Process in Coal-Fired Power Units
Research on Deep Peak Shaving Performance of 1 000 MW Ultra-Supercritical Coal-Fired Boiler
Optimization of 700℃ Ultra-supercritical Single Reheat Power Generation System
Electricity Spot Market Price Prediction Based on Multi-Modal Large Models
Climate-Adaptive Power Systems Empowered by Large Language Models: Challenges and Perspectives
Related Author
CHEN Lu
WANG Bo
WANG Dengliang
CHEN Weixiong
LIU Jiping
DING Yong
Mei YANG
Yunlong ZHOU
Related Institution
State Key Laboratory of Multiphase Flow in Power Engineering, Xi’an Jiaotong University
China Energy Digital Technology Group Co., Ltd., Chaoyang District
Guoneng Jinjie Energy Co., Ltd.
Key Laboratory of Thermal-Fluid Science and Engineering of Ministry of Education, Xi’an Jiaotong University
China Energy Jiangxi New Energy Industry Co., Ltd.

