Your Location:
Home >
Browse articles >
Study on Technical Scheme of Flue Gas Waste Heat Utilization in Utility Boiler
Power Generation Technology   Vol. 40, Issue 3, Pages: 276-280(2019)
Energy Clean and Efficient Utilization in Coal-fired Power Systems|Updated:2025-07-04
  • Export

  • Collection

  • Album

    • Study on Technical Scheme of Flue Gas Waste Heat Utilization in Utility Boiler

    • DOI:10.12096/j.2096-4528.pgt.18240    

      CLC:

    Scan QR Code

  •  
  •  
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

47

Views

370

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Outline

Related Articles

Multi-Objective Prediction Model for Combustion State of Biomass Circulating Fluidized Bed Boiler Based on Multi-Scale Feature Fusion Enhanced Neural Network
Analysis of Influence of Flue Gas Recirculation on Thermodynamic Performance and Economic Efficiency of 125 MW Supercritical CO2 Coal-Fired Power Generation Unit
Research on Auto-Coupling PID Control Method of Firing Rate to Feed Water Ratio System of Supercritical Unit
Optimization Method of Flow Field for Alleviating Clogging of Mist Eliminator in Desulfurization Tower
Application Status and Existing Problem Analysis of the Natural Draft Cooling Towers With Flue Gas Injection Technology in Thermal Power Plants

Related Author

GAN Yunhua
WEI Shuai
ZHONG Weiwen
MAI Xiaofeng
CHEN Zheng’an
ZHAO Xuanhao
CHEN Jing
LIU Hui

Related Institution

School of Electric Power Engineering, South China University of Technology
Guangdong Yudean Zhanjiang Biomass Power Co., Ltd.
State Key Laboratory of Coal Combustion (Huazhong University of Science and Technology)
CHN Energy Group New Energy Technology Research Institute Co., Ltd., Chaoyang District
GD Power Development Co., Ltd., Chaoyang District