Your Location:
Home >
Browse articles >
Analysis and Test Verification of Turbine Generator's Leading Phase Operation Capability
Power Generation Technology   Vol. 40, Issue 5, Pages: 488-492(2019)
Power Generation and Environmental Protection|Updated:2025-06-06
  • Export

  • Collection

  • Album

    • Analysis and Test Verification of Turbine Generator's Leading Phase Operation Capability

    • DOI:10.12096/j.2096-4528.pgt.18233    

      CLC:

    Scan QR Code

  •  
  •  
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

107

Views

546

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Outline

Related Articles

Study on Fluidization Characteristics of Pulse-Type Hood in Circulating Fluidized Bed Boilers
Climate-Adaptive Power Systems Empowered by Large Language Models: Challenges and Perspectives
Transformer and Q Learning Dual-Driven Smart Generation Control for New Power Systems
YOLOv5m and Segment Anything Model Collaborative Segmentation Method for Rapid and Accurate Detection of Incoming Coal Particle Size in Thermal Power Plants
Numerical Simulation and Temperature Control Performance of Lithium Battery Thermal Management System Based on Composite Phase Change Material

Related Author

No data

Related Institution

No data