汽轮机高位布置超超临界燃煤发电系统变工况㶲经济性分析
|
|
李延兵, 贾树旺, 张军亮, 符悦, 刘明, 严俊杰
|
Exergy Economic Analysis of Ultra-Supercritical Coal-Fired Power Plants With High-Level Layout of Turbine Under Load-Cycling Conditions
|
|
Yanbing LI, Shuwang JIA, Junliang ZHANG, Yue FU, Ming LIU, Junjie YAN
|
|
表9 各设备的㶲和㶲经济性分析
|
Tab. 9 Exergy and exergy economic analysis of each equipment
|
|
| 设备k | EF, k /kW | EP, k /kW | ED, k /kW | Zk /(元/s) | cF, k /(元/kJ) | cP, k /(元/kJ) |
|---|
| HP1 | 125.57 | 118.45 | 7.12 | 1.53 | 1.000 0 | 1.073 0 | | HP2 | 39.15 | 37.73 | 1.41 | 0.65 | 1.000 0 | 1.054 7 | | HP3 | 49.87 | 47.55 | 2.32 | 0.77 | 1.000 0 | 1.065 0 | | IP1 | 111.20 | 106.31 | 4.89 | 1.41 | 0.374 3 | 0.404 8 | | IP2 | 98.80 | 95.63 | 3.17 | 1.33 | 0.374 3 | 0.400 6 | | IP3 | 68.22 | 65.74 | 2.49 | 1.00 | 0.374 3 | 0.403 7 | | LP1 | 36.48 | 34.26 | 2.22 | 0.60 | 0.374 3 | 0.416 0 | | LP2 | 75.71 | 70.53 | 5.17 | 1.04 | 0.374 3 | 0.416 5 | | LP3 | 47.61 | 43.61 | 4.00 | 0.72 | 0.374 3 | 0.425 1 | | LP4 | 61.95 | 53.60 | 8.35 | 0.43 | 0.374 3 | 0.448 2 | | HT1 | 0 | 0 | 0 | 0.53 | 1.000 0 | 0 | | HT2 | 34.95 | 33.47 | 1.48 | 0.53 | 1.000 0 | 0.115 4 | | HT3 | 53.01 | 49.75 | 3.26 | 0.87 | 1.000 0 | 0.271 8 | | HT4 | 31.30 | 27.99 | 3.31 | 0.55 | 0.374 3 | 0.203 1 | | HT5 | 36.23 | 34.96 | 1.26 | 1.28 | 0.374 3 | 0.296 2 | | HT6 | 9.07 | 8.22 | 0.85 | 0.21 | 0.374 3 | 0.088 3 | | HT7 | 16.84 | 14.24 | 2.60 | 0.45 | 0.374 3 | 0.228 4 | | HT8 | 8.42 | 7.05 | 1.37 | 0.30 | 0.374 3 | 0.228 9 | | HT9 | 6.67 | 6.21 | 0.47 | 0.34 | 0.374 3 | 0.466 1 |
|
|
|