水电联产机组低负荷工况海水淡化系统供汽方案研究 |
||||||||||||
霍丽新, 王日成 | ||||||||||||
Study on Steam Supply Scheme of Seawater Desalination System Under Low Load Condition of Dual-Purpose Power and Water Plant Units |
||||||||||||
Lixin HUO, Richeng WANG | ||||||||||||
表9 供汽方案及相应煤耗 |
||||||||||||
Tab. 9 Steam supply scheme and the corresponding coal consumption |
||||||||||||
|
||||||||||||