考虑风电消纳的热电厂蓄热罐效益成本分析
张辉, 顾秀芳, 陈艳宁, 罗振鹏, 王宸

Benefit Cost Analysis of Thermal Storage Tank in Thermal Power Plant Considering Wind Power Consumption
Hui ZHANG, Xiufang GU, Yanning CHEN, Zhenpeng LUO, Chen WANG
表6 风电装机容量为900 MW?h的效益分析
Tab. 6 Benefit analysis of wind power plant with installed capacity of 900 MW?h
蓄热罐容量/(MW∙h)弃风消纳量/(MW∙h)方案成本/ 万元方案效益/万元总收益/ 万元
403 1493 16110487
1 500111 92616 4783 6723 005
3 000217 06516 4787 1155 780
4 500227 01916 4787 4425 439
6 000227 01916 4787 4424 771