发电技术 ›› 2019, Vol. 40 ›› Issue (5): 448-454.DOI: 10.12096/j.2096-4528.pgt.19051

• 能源互联网 • 上一篇    下一篇

计及人因可靠性的变电站自动化系统失效风险评估

黄宇1(),蒋猛1,张简炼2,廖伟涵2,郭创新2   

  1. 1 贵阳供电局, 贵州省 贵阳市 550002
    2 浙江大学电气工程学院, 浙江省 杭州市 310027
  • 收稿日期:2019-04-14 出版日期:2019-10-30 发布日期:2019-11-05
  • 作者简介:黄宇(1987),男,硕士,工程师,研究方向为电力系统调度,智能变电站等, 303767806@qq.com
  • 基金资助:
    国家自然科学基金项目(51537010)

Risk Assessment of Substation Automation System Failure Considering Human Reliability

Yu HUANG1(),Meng JIANG1,Jianlian ZHANG2,Weihan LIAO2,Chuangxin GUO2   

  1. 1 Guiyang Electric Power Supply Bureau, Guiyang 550002, Guizhou Province, China
    2 College of Electrical Engineering, Zhejiang University, Hangzhou 310027, Zhejiang Province, China
  • Received:2019-04-14 Published:2019-10-30 Online:2019-11-05
  • Supported by:
    National Natural Science foundation of China(51537010)

摘要:

目前对于变电站自动化系统的可靠性研究鲜有涉及人为因素的定量影响,而许多电网事故是由人为失误引起的,因此提出了一种计及人因可靠性的变电站自动化系统失效风险评估方法。首先根据工作人员所处场景采用层次分析法-成功似然指数法评估人为失效概率以此修正设备故障概率,其次基于IEC-61850的功能分解对自动化系统各种功能的失效风险进行评估,最终融合为系统失效风险,以此描述当前系统可靠性,为调度部门决策提供指导。算例结果表明,人为因素对于系统失效风险有着较大的影响,计及人因可靠性可更为客观地描述系统风险,为调度操作人员提供风险预警。

关键词: 变电站自动化系统, 智能变电站, 人因可靠性

Abstract:

Currently, there are few research on the influence of human reliability upon the reliability of integrated substation automation system (ISAS). This paper proposed a risk assessment method of ISAS considering human reliability. First, according to the operators work condition, estimate the human error probability based on analytic hierarchy process-smart substation automation system to correct the failure probability of physical devices. Then, adopt the function decomposition based method to assess the failure risk of functions. Finally, obtain the failure risk of ISAS by mixing the function risks to characterize the reliability of ISAS and offer guidance to dispatching department. The big impact of human reliability on the ISAS risk is demonstrated in case study, which means considering human reliability is more objective than the traditional method.

Key words: substation automation system, smart substation, human reliability